Follow
Ali Badri
Title
Cited by
Cited by
Year
Day-ahead scheduling of virtual power plant in joint energy and regulation reserve markets under uncertainties
A Shayegan-Rad, A Badri, A Zangeneh
Energy 121, 114-125, 2017
1252017
Strategic bidding of virtual power plant in energy markets: A bi-level multi-objective approach
M Shafiekhani, A Badri, M Shafie-Khah, JPS Catalão
International Journal of Electrical Power & Energy Systems 113, 208-219, 2019
1192019
Decentralized multi-agent based energy management of microgrid using reinforcement learning
E Samadi, A Badri, R Ebrahimpour
International Journal of Electrical Power & Energy Systems 122, 106211, 2020
1082020
Application of artificial neural networks and fuzzy logic methods for short term load forecasting
A Badri, Z Ameli, AM Birjandi
Energy Procedia 14, 1883-1888, 2012
1062012
The plug-in electric vehicles for power system applications: The vehicle to grid (V2G) concept
SS Hosseini, A Badri, M Parvania
2012 IEEE International Energy Conference and Exhibition (ENERGYCON), 1101-1106, 2012
972012
Energy management in multi-microgrids considering point of common coupling constraint
F Khavari, A Badri, A Zangeneh
International Journal of Electrical Power & Energy Systems 115, 105465, 2020
812020
A survey on mobile energy storage systems (MESS): Applications, challenges and solutions
SS Hosseini, A Badri, M Parvania
Renewable and Sustainable Energy Reviews 40, 161-170, 2014
522014
Optimal bidding strategies in oligopoly markets considering bilateral contracts and transmission constraints
A Badri, S Jadid, M Rashidinejad, MP Moghaddam
Electric Power Systems Research 78 (6), 1089-1098, 2008
492008
Security constrained optimal bidding strategy of GenCos in day ahead oligopolistic power markets: a Cournot-based model
A Badri, M Rashidinejad
Electrical Engineering 95, 63-72, 2013
352013
A comparison of centralized and decentralized energy-management models of multi-microgrid systems
F Khavari, A Badri, A Zangeneh, M Shafiekhani
2017 Smart Grid Conference (SGC), 1-6, 2017
342017
Risk‐based optimal energy management of virtual power plant with uncertainties considering responsive loads
A Shayegan Rad, A Badri, A Zangeneh, M Kaltschmitt
International Journal of Energy Research 43 (6), 2135-2150, 2019
332019
Long term preventive generation maintenance scheduling with network constraints
A Badri, AN Niazi, SM Hoseini
Energy procedia 14, 1889-1895, 2012
282012
Analytical approach in computing nash equilibrium for oligopolistic competition of transmission-constrained GENCOs
I Taheri, M Rashidinejad, A Badri, A Rahimi-Kian
IEEE systems journal 9 (4), 1452-1462, 2014
262014
Energy management in multi‐microgrids via an aggregator to override point of common coupling congestion
F Khavari, A Badri, A Zangeneh
IET generation, transmission & distribution 13 (5), 634-642, 2019
252019
Preventive generation maintenance scheduling considering system reliability and energy purchase in restructured power systems
A Badri, AN Niazi
Journal of Basic and Applied Scientific Research 2 (12), 12773-12786, 2012
202012
The effect of suitable network modeling in voltage stability assessment
SM Abbasi, F Karbalaei, A Badri
IEEE Transactions on Power Systems 34 (2), 1650-1652, 2019
192019
A bi‐level stochastic framework for VPP decision making in a joint market considering a novel demand response scheme
E Ghorbankhani, A Badri
International Transactions on Electrical Energy Systems 28 (1), e2473, 2018
172018
A risk-based gaming framework for VPP bidding strategy in a joint energy and regulation market
M Shafiekhani, A Badri
Iranian Journal of Science and Technology, Transactions of Electrical …, 2019
142019
Non-convex constrained economic dispatch with valve point loading effect using a grey wolf optimizer algorithm
M Moradi, A Badri, R Ghandehari
2016 6th Conference on Thermal Power Plants (CTPP), 96-104, 2016
122016
Annual coordinated generation and transmission maintenance scheduling considering network constraints and energy not supplied
A Norozpour Niazi, A Badri, S Khoshnoud
International Transactions on Electrical Energy Systems 25 (9), 1831-1847, 2015
112015
The system can't perform the operation now. Try again later.
Articles 1–20