Characterization of process variability in construction
M Poshdar, VA González, GM Raftery, F Orozco
Journal of Construction Engineering and Management 140 (11), 05014009, 2014
232014
A probabilistic-based method to determine optimum size of project buffer in construction schedules
M Poshdar, VA González, GM Raftery, F Orozco, JS Romeo, E Forcael
Journal of Construction Engineering and Management 142 (10), 04016046, 2016
152016
Interplay of lean thinking and social dynamics in construction
VA González, R Sacks, I Pavez, M Poshdar, L Ben
Proc. 23rd Ann. Conf. of the International Group for Lean Construction …, 2015
102015
A non-queue-based paradigm in Discrete-Event-Simulation modelling for construction operations
H Golzarpoor, VA González, M O'Sullivan, M Shahbazpour, CG Walker, ...
Simulation Modelling Practice and Theory 77, 49-67, 2017
82017
The Role of Conceptual Modeling in Lean Construction Simulation
M Poshdar, VA González, M O’Sullivan, M Shahbazpour, CG Walker, ...
82016
A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
M Poshdar, VA González, GM Raftery, F Orozco, GG Cabrera-Guerrero
Automation in Construction 92, 46-58, 2018
62018
Improving construction environmental metrics through integration of discrete event simulation and life cycle analysis
H Golzarpoor, V González, M Poshdar
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2013
42013
Preparation of small to medium-sized enterprises to earthquake disaster
T Egbelakin, M Poshdar, KQ Walsh, J Ingham, D Johnston, J Becker, ...
Bulletin of the New Zealand Society for Earthquake Engineering 51 (4), 171-182, 2018
32018
BUFFER MANAGEMENT IN CONSTRUCTION-A NEW ZEALAND STUDY
M Poshdar, VA González, B Kasiviswanathan
32018
Towards a conceptual modeling framework for construction simulation
MA Abdelmegid, VA González, AM Naraghi, M O' Sullivan, CG Walker, ...
2017 Winter Simulation Conference (WSC), 2372-2383, 2017
32017
An Advanced Framework to Manage Uncertainty and Buffers in Construction
M Poshdar
PhD Thesis-University of Auckland, 2015
32015
A vision for the future of the computer-aided tolerance management in construction based on the lessons learned from manufacturing
S Talebi, P Tzortzopoulos, L Koskela, M Poshdar, ID Tommelein, A Tezel, ...
Proceedings of the CIB World Building Congress, Hong Kong, China, 17-21, 2019
22019
Envision of an integrated information system for project-driven production in construction
R Antunes, M Poshdar
arXiv preprint arXiv:1807.04966, 2018
22018
Implementation of Hybrid Simulation Modelling Framework in Construction
A.N. Naraghi, V.A. González, M.J. O’Sullivan, C.H. Walker, M. Poshdar, M.A ...
Join Conference on Computing in Construction (JC3) 1, 439-446, 2017
2*2017
An Inclusive Probabilistic Buffer Allocation Method
M Poshdar, VA González, S Belayutham
23rd Annual Conference of the International Group for Lean Construction …, 2015
22015
ESTABLISHING A LINK BETWEEN THE LAST PLANNER SYSTEM AND SIMULATION: A CONCEPTUAL FRAMEWORK
MA Abdelmegid, VA González, M O’Sullivan, CG Walker, M Poshdar, ...
2
Barriers to adopting simulation modelling in construction industry
MA Abdelmegid, VA González, M Poshdar, M O'Sullivan, CG Walker, ...
Automation in Construction 111, 103046, 2020
12020
INFORMATION TECHNOLOGY AND NEW ZEALAND CONSTRUCTION INDUSTRY; AN EMPIRICAL STUDY TOWARDS STRATEGIC ALIGNMENT OF PROJECTS AND ORGANISATIONS
H Eliwa, MB Jelodar, M Poshdar
18th International Conference on Construction Applications of Virtual …, 2018
12018
An Overview of Economic Impact of Resilient Seismic Technologies on Earthquake Insurance in New Zealand
S Zarinkamar, M Poshdar, P Quenneville, S Wilkinson
New Zealand Society of Earthquake Engineering (NZSEE) Conference, Auckland …, 2018
12018
Finding a Secure “Completion Time” for a Construction Project: A Test Experiment
MM Poshdar, VA González
12015