Mani Poshdar
Título
Citado por
Citado por
Año
Characterization of process variability in construction
M Poshdar, VA González, GM Raftery, F Orozco
Journal of Construction Engineering and Management 140 (11), 05014009, 2014
222014
A probabilistic-based method to determine optimum size of project buffer in construction schedules
M Poshdar, VA González, GM Raftery, F Orozco, JS Romeo, E Forcael
Journal of Construction Engineering and Management 142 (10), 04016046, 2016
142016
Interplay of lean thinking and social dynamics in construction
VA González, R Sacks, I Pavez, M Poshdar, L Ben
Proc. 23rd Ann. Conf. of the International Group for Lean Construction …, 2015
102015
A non-queue-based paradigm in Discrete-Event-Simulation modelling for construction operations
H Golzarpoor, VA González, M O'Sullivan, M Shahbazpour, CG Walker, ...
Simulation Modelling Practice and Theory 77, 49-67, 2017
72017
The Role of Conceptual Modeling in Lean Construction Simulation
M Poshdar, VA González, M O’Sullivan, M Shahbazpour, CG Walker, ...
72016
A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules
M Poshdar, VA González, GM Raftery, F Orozco, GG Cabrera-Guerrero
Automation in Construction 92, 46-58, 2018
62018
Improving construction environmental metrics through integration of discrete event simulation and life cycle analysis
H Golzarpoor, V González, M Poshdar
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2013
42013
Preparation of small to medium-sized enterprises to earthquake disaster
T Egbelakin, M Poshdar, KQ Walsh, J Ingham, D Johnston, J Becker, ...
Bulletin of the New Zealand Society for Earthquake Engineering 51 (4), 171-182, 2018
32018
BUFFER MANAGEMENT IN CONSTRUCTION-A NEW ZEALAND STUDY
M Poshdar, VA González, B Kasiviswanathan
32018
Towards a conceptual modeling framework for construction simulation
MA Abdelmegid, VA González, AM Naraghi, M O' Sullivan, CG Walker, ...
2017 Winter Simulation Conference (WSC), 2372-2383, 2017
32017
An Advanced Framework to Manage Uncertainty and Buffers in Construction
M Poshdar
PhD Thesis-University of Auckland, 2015
32015
A vision for the future of the computer-aided tolerance management in construction based on the lessons learned from manufacturing
S Talebi, P Tzortzopoulos, L Koskela, M Poshdar, ID Tommelein, A Tezel, ...
Proceedings of the CIB World Building Congress, Hong Kong, China, 17-21, 2019
22019
Envision of an integrated information system for project-driven production in construction
R Antunes, M Poshdar
arXiv preprint arXiv:1807.04966, 2018
22018
An Inclusive Probabilistic Buffer Allocation Method
M Poshdar, VA González, S Belayutham
23rd Annual Conference of the International Group for Lean Construction …, 2015
22015
Barriers to adopting simulation modelling in construction industry
MA Abdelmegid, VA González, M Poshdar, M O'Sullivan, CG Walker, ...
Automation in Construction 111, 103046, 2020
12020
INFORMATION TECHNOLOGY AND NEW ZEALAND CONSTRUCTION INDUSTRY; AN EMPIRICAL STUDY TOWARDS STRATEGIC ALIGNMENT OF PROJECTS AND ORGANISATIONS
H Eliwa, MB Jelodar, M Poshdar
18th International Conference on Construction Applications of Virtual …, 2018
12018
An Overview of Economic Impact of Resilient Seismic Technologies on Earthquake Insurance in New Zealand
S Zarinkamar, M Poshdar, P Quenneville, S Wilkinson
New Zealand Society of Earthquake Engineering (NZSEE) Conference, Auckland …, 2018
12018
Finding a Secure “Completion Time” for a Construction Project: A Test Experiment
MM Poshdar, VA González
12015
ESTABLISHING A LINK BETWEEN THE LAST PLANNER SYSTEM AND SIMULATION: A CONCEPTUAL FRAMEWORK
MA Abdelmegid, VA González, M O’Sullivan, CG Walker, M Poshdar, ...
1
Determinants of construction organisations' performance: a systematic literature review
H Alquda, M Poshdar, JO Rotimi, LO Oyewobi
Proc., 42nd Australian Universities Building Education Association (AUBEA), 0
1
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20