Ronald Askin
Ronald Askin
Professor of Industrial Engineering, Arizona State University
Dirección de correo verificada de asu.edu
Título
Citado por
Citado por
Año
Modeling and analysis of manufacturing systems
RG Askin, CR Standridge
John Wiley & Sons Inc, 1993
11191993
Cell formation in group technology: review, evaluation and directions for future research
HM Selim, RG Askin, AJ Vakharia
Computers & Industrial Engineering 34 (1), 3-20, 1998
5701998
Design and analysis of lean production systems
RG Askin, JB Goldberg
John Wiley & Sons, 2007
3602007
Scheduling flexible flow lines with sequence-dependent setup times
ME Kurz, RG Askin
European Journal of Operational Research 159 (1), 66-82, 2004
2972004
Comparing scheduling rules for flexible flow lines
ME Kurz, RG Askin
International Journal of Production Economics 85 (3), 371-388, 2003
1862003
Forming effective worker teams with multi-functional skill requirements
EL Fitzpatrick, RG Askin
Computers & Industrial Engineering 48 (3), 593-608, 2005
1802005
A Hamiltonian path approach to reordering the part-machine matrix for cellular manufacturing
RG Askin, SH Cresswell, JB Goldberg, AJ Vakharia
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 29 (6), 1081-1100, 1991
1741991
A graph partitioning procedure for machine assignment and cell formation in group technology
RG Askin, KS Chiu
The International Journal of Production Research 28 (8), 1555-1572, 1990
1741990
Handbook of design, manufacturing and automation
RC Dorf, A Kusiak
Wiley-Interscience, 1994
1671994
A parallel station heuristic for the mixed-model production line balancing problem
RG Askin, M Zhou
International Journal of Production Research 35 (11), 3095-3106, 1997
1521997
Project selection, scheduling and resource allocation with time dependent returns
J Chen, RG Askin
European Journal of Operational Research 193 (1), 23-34, 2009
1462009
A methodology for designing flexible cellular manufacturing systems
RG Askin, HM Selim, AJ Vakharia
IIE transactions 29 (7), 599-610, 1997
1281997
Reliability analysis of electronic devices with multiple competing failure modes involving performance aging degradation
W Huang, RG Askin
Quality and Reliability Engineering International 19 (3), 241-254, 2003
1272003
Heuristic scheduling of parallel machines with sequence-dependent set-up times
ME Kurz, RG Askin
International journal of production research 39 (16), 3747-3769, 2001
1152001
Forming effective worker teams for cellular manufacturing
RG Askin, Y Huang
International Journal of Production Research 39 (11), 2431-2451, 2001
1152001
Optimal new product design using quality function deployment with empirical value functions
D Dawson, RG Askin
Quality and Reliability Engineering International 15 (1), 17-32, 1999
1011999
Formation of independent flow-line cells based on operation requirements and machine capabilities
RG Askin, M Zhou
IIE transactions 30 (4), 319-329, 1998
941998
A procedure for production lot sizing with probabilistic dynamic demand
RG Askin
Aiie Transactions 13 (2), 132-137, 1981
921981
Determining the number of kanbans in multi-item just-in-time systems
RG Askin, M George Mitwasi, JB Goldberg
IIE transactions 25 (1), 89-98, 1993
901993
A multiobjective evaluation of flexible manufacturing system loading heuristics
YJ Chen, RG Askin
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 28 (5), 895-911, 1990
871990
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20