A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations
L Mönch, JW Fowler, S Dauzere-Peres, SJ Mason, O Rose
Journal of scheduling 14 (6), 583-599, 2011
2922011
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
L Mönch, H Balasubramanian, JW Fowler, ME Pfund
Computers & Operations Research 32 (11), 2731-2750, 2005
2152005
Production Planning and Control for Semiconductor Wafer Fabrication Facilities
L Mönch, JW Fowler, SJ Mason
Springer, 2013
196*2013
Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
H Balasubramanian, L Mönch, J Fowler, M Pfund
International Journal of Production Research 42 (8), 1621-1638, 2004
1612004
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops
L Mönch, R Schabacker, D Pabst, JW Fowler
European Journal of Operational Research 177 (3), 2100-2118, 2007
1132007
A distributed shifting bottleneck heuristic for complex job shops
L Mönch, R Drießel
Computers & Industrial Engineering 49 (3), 363-380, 2005
932005
On the inverse acoustic scattering problem by an open arc: the sound-hard case
L Mönch
Inverse Problems 13 (5), 1379, 1997
931997
Modelling and analysis of semiconductor manufacturing in a shrinking world: challenges and successes
CF Chien, S Dauzère-Pérès, H Ehm, JW Fowler, Z Jiang, ...
European Journal of Industrial Engineering 4 5 (3), 254-271, 2011
912011
Simulation-based benchmarking of production control schemes for complex manufacturing systems
L Mönch
Control Engineering Practice 15 (11), 1381-1393, 2007
882007
Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
R Driessel, L Mönch
Computers & industrial engineering 61 (2), 336-345, 2011
792011
Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines
L Mönch, J Zimmermann, P Otto
Engineering Applications of Artificial Intelligence 19 (3), 235-245, 2006
762006
A simulation framework for the performance assessment of shop-floor control systems
L Mönch, O Rose, R Sturm
Simulation-Transactions of the Society for Modeling and Simulation …, 2003
712003
Hybrid algorithms for the vehicle routing problem with clustered backhauls and 3D loading constraints
A Bortfeldt, T Hahn, D Männel, L Mönch
European Journal of Operational Research 243 (1), 82-96, 2015
662015
A Newton method for solving the inverse scattering problem for a sound-hard obstacle
L Mönch
Inverse Problems 12 (3), 309, 1996
601996
On the numerical solution of the direct scattering problem for an open sound-hard arc
L Mönch
Journal of computational and applied mathematics 71 (2), 343-356, 1996
581996
Simulation-based performance assessment of master planning approaches in semiconductor manufacturing
T Ponsignon, L Mönch
Omega 46, 21-35, 2014
562014
FABMAS: An agent-based system for production control of semiconductor manufacturing processes
L Mönch, M Stehli, J Zimmermann
International Conference on Industrial Applications of Holonic and Multi …, 2003
562003
A methodology to solve large-scale cooperative transportation planning problems
R Sprenger, L Mönch
European Journal of Operational Research, 2012
552012
Planning wafer starts using nonlinear clearing functions: A large-scale experiment
NB Kacar, L Mönch, R Uzsoy
IEEE Transactions on Semiconductor Manufacturing 26 (4), 602-612, 2013
532013
Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing
A Klemmt, L Mönch
Proceedings of the 2012 winter simulation conference (WSC), 1-10, 2012
532012