Seguir
Dr. Anshu Gupta
Título
Citado por
Citado por
Año
Software reliability assessment with OR applications
PK Kapur, H Pham, A Gupta, PC Jha
Springer, 2011
4112011
Effect of introduction of fault and imperfect debugging on release time
PK Kapur, D Gupta, A Gupta, PC Jha
Ratio Mathematica 18 (1), 62-90, 2008
532008
A DMAIC Six Sigma approach to quality improvement in the anodising stage of the amplifier production process
P Sharma, SC Malik, A Gupta, PC Jha
International Journal of Quality & Reliability Management 35 (9), 1868-1880, 2018
482018
On how to model software reliability growth in the presence of imperfect debugging and error generation
PK Kapur, D Kumar, A Gupta, PC Jha
Proceedings of 2nd International Conference on Reliability and safety …, 2006
402006
Optimal media planning for multi-products in segmented market
PC Jha, R Aggarwal, A Gupta
Applied Mathematics and Computation 217 (16), 6802-6818, 2011
342011
Software quality assurance using software reliability growth modelling: state of the art
PK Kapur, A Gupta, PC Jha, SK Goyal
International Journal of Business Information Systems 6 (4), 463-496, 2010
262010
Quality Improvement in Manufacturing Process through SIX SIGMA: A Case Study of Indian MSME Firm
P Sharma, A Gupta, SC Malik, PC Jha
Yugoslav Journal of Operations Research 29 (4), 519-537, 2019
212019
Productivity Improvement in the Chassis Preparation Stage of the Amplifier Production Process: A DMAIC Six Sigma Methodology
A Gupta, P Sharma, SC Malik, N Agarwal, PC Jha
International Journal of Reliability, Quality and Safety Engineering 23 (06 …, 2016
212016
An integrated DEMATEL Six Sigma hybrid framework for manufacturing process improvement
A Gupta, P Sharma, A Jain, H Xue, SC Malik, PC Jha
Annals of Operations Research, 1-41, 2019
172019
Bass model revisited
PC Jha, A Gupta, PK Kapur
Journal of Statistics and Management Systems 11 (3), 413-437, 2008
172008
A discrete NHPP model for software reliability growth with imperfect fault debugging and fault generation
PK Kapur, OP Singh, O Shatnawi, A Gupta
International Journal of Performability Engineering 2 (4), 351-368, 2006
172006
Reliability analysis of project and product type software in operational phase incorporating the effect of fault removal efficiency
PK Kapur, A Gupta, PC Jha
International Journal of Reliability, Quality and Safety Engineering 14 (03 …, 2007
152007
Reliability growth modeling and optimal release policy under fuzzy environment of an N-version programming system incorporating the effect of fault removal efficiency
PK Kapur, A Gupta, PC Jha
International Journal of Automation and Computing 4, 369-379, 2007
142007
Optimal advertising on a two-dimensional web banner
A Kaul, S Aggarwal, A Gupta, N Dayama, M Krishnamoorthy, PC Jha
International Journal of System Assurance Engineering and Management 9, 306-311, 2018
132018
Multi-criteria media mix decision model for advertising a single product with segment specific and mass media
PC Jha, S Aggarwal, A Gupta, R Sarker
Journal of Industrial and Management Optimisation 12 (4), 1367-1389, 2016
132016
Innovation diffusion model for a product incorporating segment-specific strategy and the spectrum effect of promotion
PC Jha, S Aggarwal, A Gupta, UD Kumar, K Govindan
Journal of Statistics and Management Systems 17 (2), 165-182, 2014
132014
Resource reallocation strategies for sustainable efficiency improvement of retail chains
A Gupta, N Pachar, A Jain, K Govindan, PC Jha
Journal of Retailing and Consumer Services 73, 103309, 2023
122023
Effect of repeat purchase and dynamic market size on diffusion of an innovative technological consumer product in a segmented market
S Aggarwal, A Gupta, K Govindan, PC Jha, I Meidutė
Technological and Economic Development of Economy 20 (1), 97-115, 2014
122014
Optimal release policy under fuzzy environment
PK Kapur, H Pham, A Gupta, PC Jha
International Journal of System Assurance Engineering and Management 2 (1 …, 2011
122011
Efficiency assessment of Indian electronics retail stores using DEA
A Gupta, N Pachar, PC Jha, JD Darbari
International Journal of Business Performance and Supply Chain Modelling 10 …, 2019
112019
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20