Follow
Jobish Vallikavungal
Jobish Vallikavungal
Tecnológico de Monterrey
Verified email at tec.mx
Title
Cited by
Cited by
Year
Flexible job-shop scheduling problem with resource recovery constraints
J Vallikavungal Devassia, MA Salazar-Aguilar, V Boyer
International Journal of Production Research 56 (9), 3326-3343, 2018
312018
A parallel machine batch scheduling problem in a brewing company
CA Sáenz-Alanís, J VD, MA Salazar-Aguilar, V Boyer
The International Journal of Advanced Manufacturing Technology 87, 65-75, 2016
262016
The generalized flexible job shop scheduling problem
V Boyer, J Vallikavungal, XC Rodríguez, MA Salazar-Aguilar
Computers & Industrial Engineering 160, 107542, 2021
192021
On soft lattice operations
VD Jobish, KV Babitha, SJ John
J Adv Res Pure Math 5 (2), 71-86, 2013
82013
Fast and efficient algorithms to handle the dynamism in a single machine scheduling problem with sequence-dependent setup times
F Angel-Bello, J Vallikavungal, A Alvarez
Computers & Industrial Engineering 152, 106984, 2021
52021
Two approaches to handle the dynamism in a scheduling problem with sequence-dependent setup times
F Angel-Bello, J Vallikavungal, A Alvarez
Expert Systems with Applications 167, 114137, 2021
42021
3-sequent achromatic sum of graphs
C Dominic, JV Devassia
Discrete Mathematics, Algorithms and Applications, 2150039, 2020
2020
Simultaneous consideration of sequence-dependent and position-dependent setup times in single machine scheduling problems
F Angel-Bello, J Vallikavungal, A Alvarez
J. Math. Comput. Sci. 10 (5), 2033-2052, 2020
2020
The system can't perform the operation now. Try again later.
Articles 1–8