Seguir
Alain HAIT
Título
Citado por
Citado por
Año
The energy scheduling problem: Industrial case-study and constraint propagation techniques
C Artigues, P Lopez, A Haït
International Journal of Production Economics 143 (1), 13-23, 2013
1262013
Project scheduling under uncertainty using fuzzy modelling and solving techniques
M Masmoudi, A Hait
Engineering Applications of Artificial Intelligence 26 (1), 135-149, 2013
1082013
Integrated production and utility system approach for optimizing industrial unit operations
MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann
Energy 35 (2), 611-627, 2010
1012010
Integrated production and utility system approach for optimizing industrial unit operations
MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann
Energy 35 (2), 611-627, 2010
1012010
On electrical load tracking scheduling for a steel plant
A Hait, C Artigues
Computers & Chemical Engineering 35 (12), 3044-3047, 2011
652011
Motion planning on rough terrain for an articulated vehicle in presence of uncertainties
A Hait, T Simeon
Proceedings of IEEE/RSJ International Conference on Intelligent Robots and …, 1996
521996
Gestion de production et ressources humaines: méthodes de planification dans les systèmes productifs
P Baptiste
Presses inter Polytechnique, 2005
512005
A hybrid CP/MILP method for scheduling with energy costs
A Hait, C Artigues
European Journal of Industrial Engineering 5 (4), 471-489, 2011
452011
Robust motion planning for rough terrain navigation
A Haït, T Siméon, M Taïx
Proceedings 1999 IEEE/RSJ International Conference on Intelligent Robots and …, 1999
421999
A rough-cut capacity planning model with overlapping
G Baydoun, A Haït, R Pellerin, B Clément, G Bouvignies
OR spectrum 38, 335-364, 2016
312016
Algorithms for rough terrain trajectory planning
A Haït, T Simeon, M Taïx
Advanced Robotics 16 (8), 673-699, 2002
272002
Scheduling under energy constraints
C Artigues, P Lopez, A Haït
International Conference on Industrial Engineering and Systems Management …, 2009
262009
A novel solution approach with ML-based pseudo-cuts for the Flight and Maintenance Planning problem
F Peschiera, R Dell, J Royset, A Haït, N Dupin, O Battaïa
OR Spectrum 43, 635-664, 2021
202021
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants
R Théry, G Hetreux, MH Agha, A Haït, JM Le Lann
International Journal of Production Research 50 (3), 623-646, 2012
172012
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants
R Théry, G Hetreux, MH Agha, A Haït, JM Le Lann
International Journal of Production Research 50 (3), 623-646, 2012
172012
Fuzzy uncertainty modelling for project planning: application to helicopter maintenance
M Masmoudi, A Haït
International journal of production research 50 (13), 3594-3611, 2012
162012
A new event-based MILP model for the resource-constrained project scheduling problem with variable intensity activities
A Haït, G Baydoun
The IEEE international conference on industrial engineering and engineering …, 2012
152012
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity
M Masmoudi, A Haït
Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011
112011
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity
M Masmoudi, A Haït
Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011
112011
A tactical model under uncertainty for helicopter maintenance planning
M Masmoudi, A Haït
the 8th ENIM IFAC International Conference of Modeling and Simulation, MOSIM …, 2010
112010
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20