A bi-objective supply chain design problem with uncertainty Y Cardona-Valdés, A Álvarez, D Ozdemir Transportation Research Part C: Emerging Technologies 19 (5), 821-832, 2011 | 156 | 2011 |
Efficient metaheuristic algorithm and re-formulations for the unrelated parallel machine scheduling problem with sequence and machine-dependent setup times O Avalos-Rosales, F Angel-Bello, A Alvarez The International Journal of Advanced Manufacturing Technology 76, 1705-1718, 2015 | 115 | 2015 |
Metaheuristic procedure for a bi-objective supply chain design problem with uncertainty Y Cardona-Valdés, A Álvarez, J Pacheco Transportation Research Part B: Methodological 60, 66-84, 2014 | 76 | 2014 |
A bi-objective vehicle routing problem with time windows: A real case in Tenerife B Melián-Batista, A De Santiago, F AngelBello, A Alvarez Applied Soft Computing 17, 140-152, 2014 | 71 | 2014 |
A tabu search approach to an urban transport problem in northern Spain J Pacheco, A Alvarez, S Casado, JL González-Velarde Computers & Operations Research 36 (3), 967-979, 2009 | 63 | 2009 |
Two improved formulations for the minimum latency problem F Angel-Bello, A Alvarez, I García Applied Mathematical Modelling 37 (4), 2257-2266, 2013 | 57 | 2013 |
Large-scale public R&D portfolio selection by maximizing a biobjective impact measure IS Litvinchev, F López, A Alvarez, E Fernández IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and …, 2010 | 54 | 2010 |
A single machine scheduling problem with availability constraints and sequence-dependent setup costs F Ángel-Bello, A Álvarez, J Pacheco, I Martínez Applied Mathematical Modelling 35 (4), 2041-2050, 2011 | 52 | 2011 |
Including preventive maintenance activities in an unrelated parallel machine environment with dependent setup times O Avalos-Rosales, F Angel-Bello, A Álvarez, Y Cardona-Valdés Computers & Industrial Engineering 123, 364-377, 2018 | 51 | 2018 |
Scatter search for network design problem AM Alvarez, JL González-Velarde, K De-Alba Annals of Operations Research 138, 159-178, 2005 | 51 | 2005 |
A multi-start algorithm to design a multi-class classifier for a multi-criteria ABC inventory classification problem D López-Soto, F Angel-Bello, S Yacout, A Alvarez Expert systems with Applications 81, 12-21, 2017 | 45 | 2017 |
A heuristic approach for a scheduling problem with periodic maintenance and sequence-dependent setup times F Angel-Bello, A Alvarez, J Pacheco, I Martinez Computers & Mathematics with Applications 61 (4), 797-808, 2011 | 45 | 2011 |
GRASP embedded scatter search for the multicommodity capacitated network design problem AM Alvarez, JL González-Velarde, K De-Alba Journal of Heuristics 11, 233-257, 2005 | 42 | 2005 |
Optimizing vehicle routes in a bakery company allowing flexibility in delivery dates J Pacheco, A Alvarez, I García, F Angel-Bello Journal of the Operational Research Society 63 (5), 569-581, 2012 | 41 | 2012 |
A computational tool for optimizing the urban public transport: A real application A Alvarez, S Casado, JL Gonzalez Velarde, J Pacheco Journal of computer and systems sciences international 49, 244-252, 2010 | 36 | 2010 |
A multi-start tabu search method for a single-machine scheduling problem with periodic maintenance and sequence-dependent set-up times J Pacheco, F Ángel-Bello, A Álvarez Journal of Scheduling 16, 661-673, 2013 | 34 | 2013 |
A hybrid metaheuristic algorithm for a parallel machine scheduling problem with dependent setup times S Báez, F Angel-Bello, A Alvarez, B Melián-Batista Computers & Industrial Engineering 131, 295-305, 2019 | 33 | 2019 |
A location-allocation heuristic for a territory design problem in a beverage distribution firm JA Segura-Ramiro, RZ Ríos-Mercado, AM Álvarez-Socarrás, ... Proceedings of the 12th annual international conference on industrial …, 2007 | 32 | 2007 |
A customer-centric routing problem with multiple trips of a single vehicle I Martínez-Salazar, F Angel-Bello, A Alvarez Journal of the Operational Research Society 66 (8), 1312-1323, 2015 | 31 | 2015 |
A metaheuristic algorithm and simulation to study the effect of learning or tiredness on sequence-dependent setup times in a parallel machine scheduling problem C Exposito-Izquierdo, F Angel-Bello, B Melián-Batista, A Alvarez, S Báez Expert Systems with Applications 117, 62-74, 2019 | 29 | 2019 |