Leopoldo Eduardo Cárdenas-Barrón
Leopoldo Eduardo Cárdenas-Barrón
Tecnológico de Monterrey
Verified email at tec.mx - Homepage
Title
Cited by
Cited by
Year
Note on: economic production quantity model for items with imperfect quality–a practical approach
SK Goyal, LE Cárdenas-Barrón
International Journal of Production Economics 77 (1), 85-87, 2002
3872002
The economic production quantity (EPQ) with shortage derived algebraically
LE Cárdenas-Barrón
International Journal of Production Economics 70 (3), 289-292, 2001
2372001
Economic production quantity with rework process at a single-stage manufacturing system with planned backorders
LE Cárdenas-Barrón
Computers & Industrial Engineering 57 (3), 1105-1113, 2009
2162009
Simulación y análisis de sistemas con ProModel
EG Dunna, HG Reyes, LEC Barrón
Pearson Educación, 2006
1922006
Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing
J Wu, LY Ouyang, LE Cárdenas-Barrón, SK Goyal
European Journal of Operational Research 237 (3), 898-908, 2014
1562014
Optimizing inventory decisions in a multi-stage multi-customer supply chain: a note
LE Cárdenas-Barrón
Transportation Research Part E: Logistics and Transportation Review 43 (5 …, 2007
1492007
Observation on:" Economic production quantity model for items with imperfect quality"[Int. J. Production Economics 64 (2000) 59-64]
LE Cárdenas-Barrón
International Journal of Production Economics 67 (2), 201-201, 2000
1462000
Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris
LE Cárdenas-Barrón, KJ Chung, G Treviño-Garza
International Journal of Production Economics 155, 1-7, 2014
1412014
Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items
AA Taleizadeh, M Noori-daryan, LE Cárdenas-Barrón
International Journal of Production Economics 159, 285-295, 2015
1402015
Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity
SC Chen, LE Cárdenas-Barrón, JT Teng
International Journal of Production Economics 155, 284-291, 2014
1352014
An economic production quantity model with random defective rate, rework process and backorders for a single stage production system
B Sarkar, LE Cárdenas-Barrón, M Sarkar, ML Singgih
Journal of Manufacturing Systems 33 (3), 423-435, 2014
1312014
Optimal manufacturing batch size with rework in a single-stage production system-A simple derivation
LE Cárdenas-Barrón
Computers & Industrial Engineering 55 (4), 758-765, 2008
1292008
The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra
LE Cárdenas-Barrón
Applied Mathematical Modelling 35 (5), 2394-2407, 2011
1212011
An inventory model with trade-credit policy and variable deterioration for fixed lifetime products
B Sarkar, S Saren, LE Cárdenas-Barrón
Annals of Operations Research 229 (1), 677-702, 2015
1152015
An inventory model with non-instantaneous receipt and exponentially deteriorating items for an integrated three layer supply chain system under two levels of trade credit
KJ Chung, LE Cárdenas-Barrón, PS Ting
International Journal of Production Economics 155, 310-317, 2014
1142014
The simplified solution procedure for deteriorating items under stock-dependent demand and two-level trade credit in the supply chain management
KJ Chung, LE Cárdenas-Barrón
Applied Mathematical Modelling 37 (7), 4653-4660, 2013
982013
Economic order quantity model for deteriorating items with planned backorder level
GA Widyadana, LE Cárdenas-Barrón, HM Wee
Mathematical and Computer Modelling 54 (5-6), 1569-1575, 2011
982011
A simple and better algorithm to solve the vendor managed inventory control system of multi-product multi-constraint economic order quantity model
LE Cárdenas-Barrón, G Treviño-Garza, HM Wee
Expert Systems with Applications 39 (3), 3888-3895, 2012
922012
A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process
AA Taleizadeh, LE Cárdenas-Barrón, B Mohammadi
International Journal of Production Economics 150, 9-27, 2014
882014
Coordinating a socially responsible closed-loop supply chain with product recycling
S Panda, NM Modak, LE Cárdenas-Barrón
International Journal of Production Economics 188, 11-21, 2017
872017
The system can't perform the operation now. Try again later.
Articles 1–20