Dr Vicente A. González
Dr Vicente A. González
Senior Lecturer, Department of Civil and Environmental Engineering, The University of Auckland
Dirección de correo verificada de auckland.ac.nz - Página principal
Título
Citado por
Citado por
Año
Predicting Safety Behavior in the Construction Industry: Development and Test of an Integrative Model
B Guo, TW Yiu, VA González
Safety Science 84, 1-11, 2016
1632016
Analysis of Causes of Delay and Time Performance in Construction Projects
FO Pablo González, Vicente González, Keith Molenaar
Journal of Construction Engineering and Management 140 (1), 1-9, 2013
131*2013
A Production Model for Construction: A Theoretical Framework.
R Antunes, VA González
Proceedings Building a Better New Zealand 2014 conference , Auckland, New …, 2014
1232014
Analysis of factors influencing productivity using craftsmen questionnaires: case study in a Chilean construction company
RA Rivas, JD Borcherding, V González, LF Alarcón
Journal of Construction Engineering and Management 137 (4), 312-320, 2011
1092011
Investigating the relationship between planning reliability and project performance
V González, LF Alarcón, F Mundaca
Production Planning and Control 19 (5), 461-474, 2008
992008
Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects
V González, LF Alarcón, K Molenaar
Automation in Construction 18 (2), 95-108, 2009
742009
Ant colony optimization model for tsunamis evacuation routes
E Forcael, V González, F Orozco, S Vargas, A Pantoja, P Moscoso
Computer‐Aided Civil and Infrastructure Engineering 29 (10), 723-737, 2014
662014
Improving planning reliability and project performance using the reliable commitment model
V González, LF Alarcón, S Maturana, F Mundaca, J Bustamante
Journal of Construction Engineering and Management 136 (10), 1129-1139, 2010
622010
Immersive virtual reality serious games for evacuation training and research: A systematic literature review
Z Feng, VA González, R Amor, R Lovreglio, G Cabrera-Guerrero
Computers & Education 127, 252-266, 2018
592018
Exploring the environmental modeling of road construction operations using discrete-event simulation
V González, T Echaveguren
Automation in Construction 24, 100-110, 2012
572012
Identifying behaviour patterns of construction safety using system archetypes
BHW Guo, TW Yiu, VA González
Accident Analysis & Prevention 80, 125-141, 2015
542015
Improving Environmental and Production Performance in Construction Projects using the Value Stream Mapping: A Case Study
S Rosenbaum, M Toledo, V González
Journal of Construction Engineering and Management 140 (2), 1-11, 2013
532013
Public transport users' and policy makers' perceptions of integrated public transport systems
S Chowdhury, Y Hadas, VA Gonzalez, B Schot
Transport Policy 61, 75-83, 2018
442018
Prototyping virtual reality serious games for building earthquake preparedness: The Auckland City Hospital case study
R Lovreglio, V Gonzalez, Z Feng, R Amor, M Spearpoint, J Thomas, ...
Advanced Engineering Informatics 38, 670-682, 2018
432018
Implementing Lean Production in Copper Mining Development Projects: Case Study
G Castillo, VAG Luis F. Alarcón
Journal of Construction Engineering and Management 141 (1), 2014
362014
Integración conceptual Green-Lean en el diseño, planificación y construcción de proyectos
P Martínez, V González, E Fonseca
Revista ingeniería de construcción 24 (1), 05-32, 2009
352009
Buffers de Programación: una estrategia complementaria para reducir la variabilidad en los procesos de construcción
V González, LF Alarcón
Revista ingeniería de construcción 18 (2), 109-119, 2003
352003
The need for enhancing earthquake evacuee safety by using virtual reality serious games
R Lovreglio, V Gonzalez, R Amor, M Spearpoint, J Thomas, M Trotter, ...
Lean & Computing in Construction Congress 2017, 2017
302017
A Green-Lean Approach for Assessing Environmental and Production Waste in Construction.
S Rosenbaum, M Toledo, V Gonzalez
Proceedings 20th International Conference for Lean Construction, San Diego …, 2012
302012
Site management of work-in-process buffers to enhance project performance using the reliable commitment model: Case study
V González, LF Alarcón, S Maturana, JA Bustamante
Journal of construction engineering and management 137 (9), 707-715, 2011
302011
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20