Follow
Xufeng Xu
Xufeng Xu
California Independent System Operator, Folsom, CA
Verified email at tongji.edu.cn
Title
Cited by
Cited by
Year
Evaluation of operational reliability of a microgrid using a short-term outage model
X Xu, J Mitra, T Wang, L Mu
IEEE Transactions on Power Systems 29 (5), 2238-2247, 2014
1192014
A hierarchical multi-agent control scheme for a black start-capable microgrid
N Cai, X Xu, J Mitra
2011 IEEE Power and Energy Society General Meeting, 1-7, 2011
752011
Toward a resilient distribution system
Y Xu, CC Liu, KP Schneider, DT Ton
2015 IEEE Power & Energy Society General Meeting, 1-5, 2015
722015
An Evaluation Strategy for Microgrid Reliability Considering the Effects of Protection System
X Xu, J Mitra, T Wang, L Mu
IEEE Transactions on Power Delivery, 1, 2015
582015
Maintenance strategies for transmission and distribution equipment [J]
Y GUO, M HUANG, X XU
East China Electric Power 12, 36-41, 2006
37*2006
Reduction of three-phase transformer inrush currents using controlled switching
J Mitra, X Xu, M Benidris
IEEE Transactions on Industry Applications 56 (1), 890-897, 2019
352019
Planning of reliable microgrids in the presence of random and catastrophic events
X Xu, J Mitra, N Cai, L Mou
International Transactions on Electrical Energy Systems 24 (8), 1151-1167, 2014
342014
Composite system reliability analysis using particle swarm optimization
J Mitra, X Xu
2010 IEEE 11th International Conference on Probabilistic Methods Applied to …, 2010
332010
Predictive analysis of microgrid reliability using a probabilistic model of protection system operation
X Xu, T Wang, L Mu, J Mitra
IEEE Transactions on Power Systems 32 (4), 3176-3184, 2016
272016
Black-start strategy of isolated microgrid
Q Meng, LH Mu, XF Xu, GF Zhu
Electric Power Automation Equipment 34 (3), 59-64, 2014
23*2014
Optimization of transmission line maintenance scheduling based on chance-constrained bilevel programming
X Xu, M Huang, T Wang, J Qiu
Autom. Electr. Power Syst 33, 25-29, 2009
22*2009
Optimization algorithm of power supply equipment maintenance scheduling and its application in regional power network
X Xufeng, H Minxiang, W Tingting
Power system technology 33 (14), 31-35, 2009
21*2009
Capacitance of water tree modeling in underground cables
Q Chen, K Burkes, E Makram, R Hadidi, X Xu
Journal of Power and Energy Engineering 2 (11), 9, 2014
202014
Power system harmonics study for unbalanced microgrid system with PV sources and nonlinear loads
Z Liu, X Xu, HA Abdelsalam, E Makram
Journal of Power and Energy Engineering 3 (05), 43, 2015
192015
A Heuristic Method for Static Line Parameter Estimation in Power Systems
X Bian, J Qiu, X Xu
PROCEEDINGS-CHINESE SOCIETY OF ELECTRICAL ENGINEERING 28 (1), 41, 2008
18*2008
基于模糊机会约束二层规划的配电网检修计划优化
许旭锋, 黄民翔, 王婷婷, 邱家驹
电工技术学报 25 (3), 157-163, 2010
152010
Assessment of operating condition dependent reliability indices in microgrids
RB de Medeiros
Clemson University, 2016
132016
A strategy for pmu placement considering the resiliency of measurement system
J Paudel, X Xu, K Balasubramaniam, EB Makram
Journal of Power and Energy Engineering 3 (11), 29-36, 2015
132015
Reliability evaluation of a microgrid considering its operating condition
X Xu, J Mitra, T Wang, L Mu
Journal of Electrical Engineering and Technology 11 (1), 47-54, 2016
112016
Distribution system reliability evaluation using credibility theory
X Xu, J Mitra
International Journal of Engineering, Science and Technology 2 (3), 107-118, 2010
72010
The system can't perform the operation now. Try again later.
Articles 1–20